email enquiry@dacocontracts.co.uk
or call us on 01543 506006
Hotel & Leisure Projects
Thistle Cardiff
Following a major fire which destroyed the main core and roof of the hotel, DACO Contracts Ltd were appointed Main Contractor to reinstate the structure, bringing back the former Grade 2 excellence. Following competitive tendering we were then appointed Main Contractor for the fit out programme. All 140 bedrooms, along with corridors, restaurant, reception, bars, function rooms and kitchens were fully refitted including all mechanical, electrical and air-conditioning services. This 12 month, multi million pound investment has now put Thistle Cardiff hotel back to forefront of this capital city.
Thistle Bloomsbury
This Central London 129 bedroom hotel, has now been returned to its former glory following our multi million pound refurbishment. This hotel was fully refurbished in phases whilst still trading. All bedrooms, corridors, public areas, restaurant, bar and meeting rooms were transformed making this hotel a premier place to stay.
Thistle Manchester
DACO Contracts Ltd has now completed one of its most recent full hotel refurbishment which was at the Thistle Manchester, this multi million pound project has taken 9 months to revive the building through its bedroom stock, corridors and public areas.

example1
Here the refurbished 98no bedrooms and suites project led to a successful negation of the contract to refurbish the main Wessex Suite, associated function rooms and all externals, which was bought in on time within budget.



Village Warrington
Village had set about re-branding their hotels with a more modern theme, Warrington being the first of its existing units to receive the new look with DACO Contracts Ltd the Main Contractor for all public areas (reception, bar and restaurant). The new concept whilst still being amended arrived on site to be fitted in record time. The restaurant and bar were closed during works but the heart of the hotel reception had to be decanted in phases to remain operational. The successful outcome lead to projects in both Bury and Newcastle.


example1
This project saw the creation and formation of a new spa leisure complex within an existing stable block and courtyard. The modern day swimming pool / spa, treatment rooms and gym was constructed by DACO Contracts Ltd to our client’s high exacting standards. Every element of our skills were used to produce an ultimate facility.
Ettington Park
Following the successful completion of Rookery Hall came the contract at Ettington Park which had suffered fire damage in the leisure area. DACO Contracts Ltd as Main Contractor embarked on a complete refurbishment of the areas, reinstating the pool and leisure back to a modern fully functional facility for all to enjoy. Total refurbishment of all the bedroom stock was carried out concurrently.
Rhinefield House
Carrying on from a full bedroom and bathroom refurbishment programme DACO Contracts were awarded the project of refurbishing / re-modelling the Hotels Orangery Brassiere. This was carried out over a 6 week period replacing the main timber and glazing to the external whilst stripping out and fitting a new kitchen operation along with re-fitting the restaurant to the new scheme.


example1
Having successfully tendered and been awarded the refurbishment of all bedroom corridors DACO Contracts put together a programme of works enabling all bedroom stock to be let whilst the project was being carried out. Phasing each area allowing handover early afternoon each day in a clean environment, thus keeping the hotels occupancy to a maximum. The close liaison built up between ourselves and Q Hotels enabled us to move forward on other projects.
example1
The hotel was looking to gain better use of areas to enable their meeting room operation to become a more refined facility. We set about removing and repositioning a function bar and cellar into a semi-redundant area allowing the existing bar cellar to be structurally altered and converted into a conference cafe / breakout area. This 4 week project was programmed around the hotels operation to ensure minimum disruption.
example1
The Hotels Director of Group Developments awarded DACO Contracts the refurbishment of a wing of their bedroom stock, carried out over a 6 week period in two phases. Tight lead ins were required along with a short programme period to allow minimum disruption maximum return on the project. The bedrooms were successfully handed over on time and within budget and we look forward to strengthening our relationship with another premier hotel chain.


Aztec Bristol
This project included the up-grade and refurbishment of meeting rooms and breakout area, whilst running alongside the refurbishment of 25No executive suite bedrooms and bathrooms.
example1
November 2010 sees DACO Contracts commence the refurbishment of bedrooms and bathrooms at the above hotel, which DACO have already competed several projects previously at this 4 star property.